The Zipline

A while ago, papa call mom to ask her if we could help him put up the poles for the zipline. Ben got there first, and helped papa mix concrete to hold the pole in place. The plan was to pour some concrete, stick the zipline pole in it, and then put in a cardboard tube. Outside of the tube we would fill with some rocks. Papa filled the inside with more concrete. Then we would let it dry. But papa must have done the math wrong, because we needed to go get more cement bags. In the middle of us working, I came over and Angus followed me. He wandered around in the plants in papa and gram’s backyard.

Before we started, papa called our uncle Matt, because the second pole we needed in the ground was much bigger than the first. When uncle Matt got here, he helped me and papa put the second pole in the ground.

We still aren’t done though, because we still need to attach the actual zipline to the pole. But before we can do that we have to wait for the concrete to finish drying fully

Published by ChaosTheEngineer

My name is Jack. I like making Lego Technic builds. On my PC, I like playing Brick Rigs, Scrap Mechanic, War Robots, Hydroneer, Wobbly Life, and Raft. I also like to read.

Leave a comment